Basic Rigging
CPCCLRG3001A Licence to perform rigging basic level
Entry Requirements:
- Participants must provide 100 points of identification, be 18 years of age or over and hold a current high risk licence for dogging.
- Maths is a major part of the theory component and a sound understanding is essential to be able to complete this training. You must have the ability to use and understand Basic English.
- Trousers, shirt and safety boots are required to be worn at each session.
Our five day training course is for people who have minimal or no rigging experience.
It’s an intensive, hands-on training course, with the majority of the time spent operating the equipment.
A strong theoretical and calculations component is also included that focuses on safe operating procedures.
On successful completion of the program you will receive a Statement of Attainment for:
- CPCCLRG3001 Licence to perform rigging basic level
You will gain an understanding of:
- CPCCLSF2001A Licence to erect, alter and dismantle scaffolding basic level
Elements and Performance Criteria
ELEMENTS
Elements describe the essential outcomes.
PERFORMANCE CRITERIA
Performance criteria describe the performance needed to demonstrate
achievement of the element.
achievement of the element.
1. Plan job
1.1. Task to be undertaken is assessed.
1.2. Potential workplace hazards are identified.
1.3. Hazard control measures are identified consistent with appropriate standards to ensure the safety of personnel and equipment.
1.4. Site information is obtained.
1.5. All forces and loads associated with erecting and dismantling structures and associated plant are considered in consultation with appropriate personnel .
1.6. Rigging equipment and associated equipment are identified in consultation with appropriate personnel according to procedures and site information.
1.7. Safety equipment is identified.
1.8. Appropriate communication methods are identified with appropriate personnel.
1.2. Potential workplace hazards are identified.
1.3. Hazard control measures are identified consistent with appropriate standards to ensure the safety of personnel and equipment.
1.4. Site information is obtained.
1.5. All forces and loads associated with erecting and dismantling structures and associated plant are considered in consultation with appropriate personnel .
1.6. Rigging equipment and associated equipment are identified in consultation with appropriate personnel according to procedures and site information.
1.7. Safety equipment is identified.
1.8. Appropriate communication methods are identified with appropriate personnel.
2. Select and inspect equipment
2.1. Rigging equipment and associated equipment are selected and inspected according to procedures and the appropriate standard.
2.2. Safety equipment is selected and inspected according to procedures.
2.3. All defective rigging equipment, associated equipment and safety equipment is isolated, reported and recorded according to procedures.
2.4. Communication equipment is selected and inspected for serviceability (where applicable.
2.2. Safety equipment is selected and inspected according to procedures.
2.3. All defective rigging equipment, associated equipment and safety equipment is isolated, reported and recorded according to procedures.
2.4. Communication equipment is selected and inspected for serviceability (where applicable.
3. Set up task
3.1. Appropriate hazard prevention /control measures are applied to the work area according to procedures.
3.2. Ground suitability is inspected and checked (where appropriate).
3.3. Site information is reviewed, interpreted and communicated to appropriate personnel and appropriate personnel .
3.4. All forces and loads associated with erecting and dismantling structures and associated plant are determined in consultation with appropriate personnel.
3.5. Safety equipment is fitted and worn correctly (where appropriate).
3.6. Rigging equipment and associated plant are positioned for work application and stability according to procedures.
3.7. Methods of applying temporary connections using fibre rope are applied according to procedures and the appropriate standard.
3.2. Ground suitability is inspected and checked (where appropriate).
3.3. Site information is reviewed, interpreted and communicated to appropriate personnel and appropriate personnel .
3.4. All forces and loads associated with erecting and dismantling structures and associated plant are determined in consultation with appropriate personnel.
3.5. Safety equipment is fitted and worn correctly (where appropriate).
3.6. Rigging equipment and associated plant are positioned for work application and stability according to procedures.
3.7. Methods of applying temporary connections using fibre rope are applied according to procedures and the appropriate standard.
4. Erect structures and plant
4.1. Structures and associated plant are erected according to procedures and site information.
4.2. Stability of structures and associated plant is maintained during erection according to procedures.
4.3. Work is conducted safely at heights including safe and effective use of safety equipment.
4.4. Appropriate communication methods and communication equipment, are used to co-ordinate the tasks.
4.5. Associated plant and rigging equipment is used according to procedures and the appropriate standard.
4.6. Temporary guys, ties, propping and shoring, including flexible steel wire rope , and tubing, are connected where required.
4.7. Associated equipment is used in a safe and appropriate manner.
4.8. The completed task is inspected according to the appropriate standard.
4.9. Excess materials are removed from the work area (where applicable).
4.2. Stability of structures and associated plant is maintained during erection according to procedures.
4.3. Work is conducted safely at heights including safe and effective use of safety equipment.
4.4. Appropriate communication methods and communication equipment, are used to co-ordinate the tasks.
4.5. Associated plant and rigging equipment is used according to procedures and the appropriate standard.
4.6. Temporary guys, ties, propping and shoring, including flexible steel wire rope , and tubing, are connected where required.
4.7. Associated equipment is used in a safe and appropriate manner.
4.8. The completed task is inspected according to the appropriate standard.
4.9. Excess materials are removed from the work area (where applicable).
5. Dismantle structures and plant
5.1. Structures and associated plant are dismantled according to procedures and the appropriate standard.
5.2. Work is conducted safely at heights including safe and effective use of safety equipment.
5.3. Stability of structures and associated plant is maintained during dismantling according to procedures.
5.4. Rigging equipment, associated equipment, safety equipment and associated plant are inspected for damage and defects.
5.5. All defective rigging equipment, associated equipment, associated plant and safety equipment are isolated reported and recorded according to procedures.
5.6. Rigging equipment and associated equipment are stored. according to procedures and the appropriate standard.
5.7. Hazard prevention/control measures are removed (where appropriate).
5.2. Work is conducted safely at heights including safe and effective use of safety equipment.
5.3. Stability of structures and associated plant is maintained during dismantling according to procedures.
5.4. Rigging equipment, associated equipment, safety equipment and associated plant are inspected for damage and defects.
5.5. All defective rigging equipment, associated equipment, associated plant and safety equipment are isolated reported and recorded according to procedures.
5.6. Rigging equipment and associated equipment are stored. according to procedures and the appropriate standard.
5.7. Hazard prevention/control measures are removed (where appropriate).
Assessment
Mandated national assessment tools are used and include Theory, Calculations and Practical Assessments

Investment: $2000
Duration: 5 days
To request group bookings, specific course dates or for any general enquiries please click the Enquire button below.